What was found
NR 3 PYLON UPPER SPAR AT THE AFT BULKHEAD HAS (4 EA) BOLTS SPINNING (NR 5,6,7 & 9) GOING INBD TO OTBD. R & R 1 EA FASTENER AT ACCESSIBLE LOCATION IAW DWG AUB 7025, REV "AZ". R & R NUTS AT 3 EA TRAPPED FASTENERS IAW EA 8-5450-136697.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NR 3 PYLON UPPER SPAR AT THE AFT BULKHEAD HAS (4 EA) BOLTS SPINNING (NR 5,6,7 & 9) GOING INBD TO OTBD. R & R 1 EA FASTENER AT ACCESSIBLE LOCATION IAW DWG AUB 7025, REV "AZ". R & R NUTS AT 3 EA TRAPPED FASTENERS IAW EA 8-5450-136697.