What was found
F/O A/S INOP DURING T/O ROLL ABORTED T/O. PVG U CHECKED F/O PITOT TUBE FOUND A BUG INSIDE, CLEARED PITOT TUBE AND PERFORMED THE PITOT TUBE INSP ALL OK IAW AMM 34-11-15-6, PERFORMED AUTO LAND SYS TEST PASSED IAW AMM 22-00-00, ACFT REMAINED CAT 3III, ACFT OK FOR SVC. FINAL CLOSED.