What was found
EMERGENCY POWER TEST WILL NOT PASS. CYCLED FUEL LEVERS AND RAN EMERGENCY POWER TEST IN REF TO AMM 24-30-00-5-0. ALL CHECKS GOOD. RAN TEST SERVERAL TIMES PASSED EACH TIME.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
EMERGENCY POWER TEST WILL NOT PASS. CYCLED FUEL LEVERS AND RAN EMERGENCY POWER TEST IN REF TO AMM 24-30-00-5-0. ALL CHECKS GOOD. RAN TEST SERVERAL TIMES PASSED EACH TIME.