What was found
EXSITING FUSELAGE SKIN REPAIR AT STA 1610-1620, STA 19R REQUIRES REPLACEMENT NOT PER CURRENT SRM REQUIREMENTS. REMOVED EXISTING DOUBLER IAW SRM 51-40-02, HFEC CUT-OUT AND HOLES IAW NTM 51-00- 01, NO CRACKS NOTED, FABRICATED REPAIR DOUBLER IAW SRM 53-00-01 FIG. 201 REPAIR 15. INSTALLED REPAIR DOUBLER AND FILLER, 8, RESHAPED CUT OUT HOLE TO RECTANGULAR SHAPE IAW 53-00-01. NDT CHECKED , NO CRACK NOTED, CATEGORY B SUPPLIMENTAL INSP. REQ. INITIAL INSP 25000 F/C REPEAT INSP. 6000 F/C INTERVALS IAW 53- 00-51 TABLE V. MAJOR REPAIR.