What was found
L1 WINDOW OUTER LAYER CRACKED AT FLT LV 400 -60C, AFTER 2.5 HRS OF FLIGHT. INSTALLED NEW L-1 WINDOW, FIRST TORQUE COMPLETED AT 2119Z. R & R L1 WINDSHIELD IAW AMM 56-11-01-4.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
L1 WINDOW OUTER LAYER CRACKED AT FLT LV 400 -60C, AFTER 2.5 HRS OF FLIGHT. INSTALLED NEW L-1 WINDOW, FIRST TORQUE COMPLETED AT 2119Z. R & R L1 WINDSHIELD IAW AMM 56-11-01-4.