What was found
CLIMBING THROUGH 10K RT ENG FAILURE, EICAS MESSAGE, RT ENG LP PUMP. ENGINE IS APPROVED FOR REMOVAL FOR METAL IN THE OIL SYSTEM BEYOND SERVICEABLE LIMITS FOLLOWING THE ATB-IFSD. R&R ENG NR 2 PER ENG CHANGE WORK CARD. PERFORMED ENG RUN, TEST SATISFACTORY.