What was found
DURING FINAL APPROACH, RECEIVED A LEADING EDGE SLAT ASSYMETRY EICAS AND ASSOCIATED CUE LIGHT. RAN QRH PROCEDURES, FLAPS 20 LANDING. LANDING NORMAL. R & R THE RT LOSS SENSING SWITCH FOR THE L/E SLATS IAW MM 27-81-41-4. PREFORMED A TEST OF THE RT LOSS SENSING SWITCH. OPS CHECKED NORMAL IAW MM 27-81-41-5.