What was found
PDIS 660 27-10 3309 26FEB20 IND FACT U LOGPAGES:3207566 UPON CONTROL CHECK, LEFT AILERONS WERE BINDING 1/2 WAY THROUGH CHECK. RIGHT FULL DEFLECTION, CHECK GOOD. SHGN 26FEB20 22:04 IND U MX NOTE: CREW NOTED LEFT AILERON ON ECAM SHOWED 80% DEFLECTION AND ALSO ON CONTROL COLUMN SCALE. ENT BY: 95505 RPT BY: 95505 SHGN 26FEB20 23:17 IND U PERFORMED AILERON CHECK AFTER TRANSLOAD, NO BINDING FELT AND FULL TRAVEL WAS EQUAL FEEL BOTH LEFT ROLL AND RIGHT. NEEDS MORE TROUBLE SHOOTING. FACT 27FEB20 00:51 IND U INSPECTED CABLE RUNS AND PULLEYS WITH NO DEFECTS FOUND. SUSPECT ICE AND SNOW CAUSING BINDING. PERFORMED AILERON MECHANICAL AND ELECTRICAL CONTROL ADJ/TEST IAW AMM 27-11-00-05-02. OPS CHECK GOOD. NO HISTORY 99 DAYS. ACFT OK FOR SERVICE