What was found
L/H I/B MAIN FLAP HAS CORROSION AT THE TRAILING EDGE UPPER SURFACE FROM THE O/B SIDE TO 24" I/B. REPAIRED CORROSION ON LH IB MAIN FLAP TE WEDGE UPPER SURFACE 2 EA LOCATIONS 6" FROM OB EDGE AND 24" FROM OB EDGE IAW B757 SRM 51-10-02, SRM 57-53-01-1A, SRM 57-53-01- 2R, AND SRM 51-70-10-2R.