What was found
CREW ENTRY DOOR 1L IS DIFFICULT TO OPEN. INSTALLED NEW HINGE MECHANISM ON L1 DOOR PER AMM 52-11-06-4 THROUGH COMPLETION OF STEP 3.D,
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CREW ENTRY DOOR 1L IS DIFFICULT TO OPEN. INSTALLED NEW HINGE MECHANISM ON L1 DOOR PER AMM 52-11-06-4 THROUGH COMPLETION OF STEP 3.D,