What was found
DURING SCHEDULED ANNUAL INSPECTION CRACKS WERE FOUND AT THE STRUCTURAL ATTACHMENT OF CENTER POST TO THE ROOF BEAM ASSY. A/C TOTAL TIME: 5818.3 C/W TB 206L-79-41 STRUCTURAL ATTACHMENT OF CENTER POST INSTALLATION, P/N 206-033-110-003 OR -005, TO ROOF BEAM ASSY, P/N 206-033-210-001, INSPECTION AND MODIFICATION OF.