What was found
DURING SCHEDULED ROUTINE MX 2.25 INCH CRACK ON RT FUSELAGE BELLY AT FS 310.00. INSTALLED FILLER AND DOUBLER REPAIR.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED ROUTINE MX 2.25 INCH CRACK ON RT FUSELAGE BELLY AT FS 310.00. INSTALLED FILLER AND DOUBLER REPAIR.