What was found
NR 1 AND NR 2 GEN TRIPPED OFF, ONE RESET, TRIPPED OFF AGAIN. REPLACED LT AND RT GENERATOR RELAY, AND LT AND RT PCDU, CONTINUITY TEST OF MAG PICKUP WIRING OK IAW WDM 24-21-01. OPS CHECK OK IAW FIM 24-20 TASK 801 AND 802.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NR 1 AND NR 2 GEN TRIPPED OFF, ONE RESET, TRIPPED OFF AGAIN. REPLACED LT AND RT GENERATOR RELAY, AND LT AND RT PCDU, CONTINUITY TEST OF MAG PICKUP WIRING OK IAW WDM 24-21-01. OPS CHECK OK IAW FIM 24-20 TASK 801 AND 802.