What was found
ETOPS SIGNIFICANT SYS - NR 2 EGT DROPPED TO 16 DEG IN CLIMP, WITH ALL OTHER ENGINE READINGS NORMAL (BOTH EICAS AND STBY ENGINE GAUGES) EGT RESUMED NORMAL DISPLAY ABOUT AFTER TAKEOFF. PERFORMED FIM 77-21-00, FIG 103 INSPECTED THERMOCOUPLE PROBES NO DEFECTS NOTED, INSPECTED CABLES, NO DEFECTS NOTED. REPLACED THERMOCOUPLE JUNCTION BOX IAW AMM 77-21-02, ON ENG RUN EGT READINGS NORMAL.