As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
ON FIRST START AFTER INSTALLATION IN THE AIRCRAFT, TOT ROSE RAPIDLY. FOUND START/ACCEL AND START/DERICH ADJUSTMENTS TURNED TO MINIMUM, NO MORE ADJUSTMENT AVAILABLE. RECEIVED UNIT IN SHOP WITH START DERICHMENT AND START ACCELERATION ADJUSTMENTS BOTH ADJUSTED TO THE CCW STOP. TESTED UNITS START DERICH OPERATION IN SHOP, TESTED SATISFACTORY. TESTED START DERICH AND START ACCEL. IN FLOW ROOM, BOTH TESTED SATISFACTORY. COMPLETED TESTING OF UNIT PER TEST SPEC. NR 12529-01, UNIT TESTED OK.