What was found
DURING SCHEDULED INSPECTION IT WAS NOTED THE LEFT ENGINE EXHAUST TRANSITION PIPE WAS CRACKED IN THE CENTER. THE TRANSITION PIPE WAS REPLACED WITH NO FURTHER DEFECTS NOTED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED INSPECTION IT WAS NOTED THE LEFT ENGINE EXHAUST TRANSITION PIPE WAS CRACKED IN THE CENTER. THE TRANSITION PIPE WAS REPLACED WITH NO FURTHER DEFECTS NOTED.