What was found
INSPECTION TYPE:C3, IAW ENGINEERING, FABRICATE NEW FLOOR PANEL FROM BS 333-440 LBL 45-65, AND SCARF FLOOR PANEL IN REWORK AREAS. FABRICATED REPLACEMENT FLOOR PANEL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INSPECTION TYPE:C3, IAW ENGINEERING, FABRICATE NEW FLOOR PANEL FROM BS 333-440 LBL 45-65, AND SCARF FLOOR PANEL IN REWORK AREAS. FABRICATED REPLACEMENT FLOOR PANEL.