Service difficulty report · Tension Tie · Boeing 7474R7F

Difficulty date
February 20, 2011
Submitted
March 23, 2011
Operation
Air carrier
Aircraft
N583UP
Make and model
Boeing 7474R7F
Aircraft time
90,628 hours, 15,846 cycles
Part
Tension Tie
Condition
Misinstalled
Location
Bs 860
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

INSPECTION TYPE:C, STA860 LT TENSION TIE FOUND FASTENER NR INCORRECT IAW EO B747-5310-41035, FIG 3. BS860 LT TENSION TIE & ATT FRAME REPAIRED, FRAME DOUBLER, TRIPLER STEEL PLATE REPLACED IAW RS R53-25-36963 & B747-5310-41901. FINAL CUTOUT FRAME LENGTH 51.375". THIS REPAIR IS CLASSIFIED AS MAJOR REPAIR REPAIR LENGTH IS 54.125" FOR FRAME AND 31.25" FOR TENSION TIE.

More about the Boeing 747-4R7F