What was found
MAJOR REPAIR, CRACK WING CENTER FRONT SPAR STIFFENER AT STA 785.9 LBL 11 (REPAIR)ACCOMPLISHED REPAIR I.A.W SRM 57-10-10-2R-2 REV.87 AND UPS SREO-58151-REQ001 REV.1 AND EO-76672-REF REV.1. 2. JOB COMPLETED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAJOR REPAIR, CRACK WING CENTER FRONT SPAR STIFFENER AT STA 785.9 LBL 11 (REPAIR)ACCOMPLISHED REPAIR I.A.W SRM 57-10-10-2R-2 REV.87 AND UPS SREO-58151-REQ001 REV.1 AND EO-76672-REF REV.1. 2. JOB COMPLETED.