What was found
NR 1 PYLON LOWER SPAR EXTENTION UNDER AFT FAIRING, DRAIN LINE UNION MOUNT STRUCTURE CRACKED/BROKEN. INSTALLED SPAR EXTENTION AT #1 PYLON LOWER AFT, UNDER AFT FAIRING, DRAIN LINE UNION MOUNT STRUCTURE IAW A300-600 SRM 51-40-21-001
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NR 1 PYLON LOWER SPAR EXTENTION UNDER AFT FAIRING, DRAIN LINE UNION MOUNT STRUCTURE CRACKED/BROKEN. INSTALLED SPAR EXTENTION AT #1 PYLON LOWER AFT, UNDER AFT FAIRING, DRAIN LINE UNION MOUNT STRUCTURE IAW A300-600 SRM 51-40-21-001