DURING C CHECK INSPECT, LT FUSE NOSE SECTION PLATING FREON SYS EXHAUST DOOR UPPER AFT JAMB CORNER CRACK DAMAGE AT STA FS 54.000, L-28L TO L-29L. PERFORMED MAJOR REPAIR IAW DC8 SRM 53-2-0 FIG 13. REMOVED EXISTING REPAIR DOUBLER IAW DC8 SRM 51-3-0. REMOVED DAMAGED SECTION IAW DC8 SRM 53-2-0 FIG 13. NDT INSPECTED REWORKED AREA IAW DC8 NDT SPM PART 06-10-01-001. NEITHER CRACK NOR CORROSION FOUND. FAB`D REPAIR DOUBLER (AL2024T3 0.071) + FILLER (AL2024T3 0.050) IAW DC8 SRM 53-2-0 FIG 13. CLEANED, TREATED, PRIMED AREA + REPAIR PARTS IAW DC8 SRM 51-1-8B. APPLIED SEALANT TO FAYING SURFACES IAW DC8 SRM 51-1-11 PG 9. INSTALLED REPAIR PARTS IAW DC8 SRM 53-2-0 FIG 13.