What was found
AFTER RE-SERVICING OF THE NLG STRUT PRESSURE HELD BUT THE FLUID BYPASSED SEAL. DURING RE-SEAL OF NLG, FOUND CORROSION IN UPPER BARREL. DISASSEMBLED, CLEANED AND VISUALLY INSPECTED. FOUND MISC BEARINGS, SEALS AND HARDWARE WORN. FOUND RING PACK AND RETAINER CORRODED. FOUND METERING PIN DAMAGED.