SDR LR7A08081

Service difficulty report · Connector · Lkheed 382G

Difficulty date
June 8, 2008
Submitted
July 1, 2008
Operation
Air carrier
Aircraft
N403LC
Make and model
Lkheed 382G
Aircraft serial
4590
Aircraft time
54,057 hours, 25,613 cycles
Part
Connector
Condition
Corroded
Location
Crossfeed Valve
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING CRUISE FLIGHT, NR 2 CROSSFEED VALVE FAILED IN THE CLOSED POSITION. NR 2 CROSSFEED VALVE SUBSEQUENTLY DEFERRED IAW MEL 28-4 CAT "C" DEFERRAL SP NR 2 COMPLIED WITH. CROSSFEED VALVE ELECTRICAL PLUG REMOVED AND BAGGED. VALVE OPENED MANUALLY AND LOCKWIRED IN THE OPEN POSITION ON LOG PAGE 27022, ITEM 2. WILL UPDATE COMPONENT INFORMATION WHEN IT BECOMES AVAILABLE. UPDATED INFORMATION IS AS FOLLOWS, FOUND CORRODED WIRE EYE TERMINAL AT POSITION "9" TB42B. REPAIR AND OPS CHECK IAW SMP581 28-22, LOG PAGE 28526 ITEM M1.