What was found
DURING SCHEDULED C-8 CHECK PER JOB CARD HC5313, FOUND COCKPIT FLOORBEAM UPPER CAP EXFOLIATION CORROSION AT FS 180, WL195, RBL12. FABRICATED AND INSTALLED UPPER CAP IAW SMP583 FIG 53-30-05 AND CHAP 51-70.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED C-8 CHECK PER JOB CARD HC5313, FOUND COCKPIT FLOORBEAM UPPER CAP EXFOLIATION CORROSION AT FS 180, WL195, RBL12. FABRICATED AND INSTALLED UPPER CAP IAW SMP583 FIG 53-30-05 AND CHAP 51-70.