What was found
DURING C-CHECK/BRIDGING INSPECTION, FOUND LT CHINE ANGLE, CENTER FUSELAGE CRACKED AT FS 574.7 TO 576, RBL 61.6, WL 143. REPAIRED BY STOP DRILLING CRACK AND INSTALLING REPAIR ANGLE AND FILLER IAW SPAR MPP L100-404-99-059. LAC MEA 382-53-99-057.