What was found
THIS WILL CLOSE OUT MALA000247, MALA000252, MALA000253, REGARDING FAILING F/D,Y/D,FTC,AP,AT,TRP & MCP DURING TURBULENCE.MX PERFORMED RUDDER Q-POT TEST, PERFORMED PP INCLUDING MOISTURE TEST, INSP OF #1,2,3 PITOT/STATIC SYSTEMS. CLEANED TERMINAL BLOCK 1CA29, PINS AND CONTACTS, SEE JOB CARD #098083 AND CONT CARDS #050281, 050283 FOR DETAILS. FROM CARD #050281, OPENED RUDDER LEADING EDGE FAIRING PANELS, 3323AR, 323BR,323CR,323AL, CLOSED PAN ELS ALL SEC CHECKS GOOD. PERFORMED FUNCTIONAL VERIFICATION TEST OF RUDDER Q-POT,ALL CHECKS GOOD.FURTHER T/S IS REQUIRED FOR FURTHER EVALUATIONOF DISC A/C TO GO TEST FLIGHT. MX REPLACED RELAY DFGS DC POWER (1CA29),REPLACED DFGS DC POWER (1CA 16), LEAK AND OP CHECK # PITOT STATI