What was found
DURING A PHASE INSPECTION IN MSP, FOUND A CRACK IN LEFT INBOARD NACELLE FORMER AT NS 120.00. THE REPAIRS WERE COMPLETED BY REPLACING THE FORMER P/N 27-35025-967 AND A SKIN PANEL, P/N 27-35001-178. ALL WORK WAS PERFORMED IAW FAC SRM 51-00-00 PAGE 4, 51-30-00, 51-40-00, AND FAC LAR 95-MALA-144. (W)