Service difficulty report · Bushing · Boeing 767319

Difficulty date
August 8, 2019
Submitted
September 3, 2019
Operation
General aviation
Filed by
MK1Y325K
Bedek Aviation Group
Aircraft
N830WE
Make and model
Boeing 767319
Aircraft serial
26913
Aircraft time
107,315 hours, 19,649 cycles
Part
Bushing
Condition
Corroded
Location
Lt Wing
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

UPON PYLON REMOVAL FOUND CORROSION DAMAGE IN THE BUSHING COMMON TO LT WING FRONT SPAR OUTBD AND INBD PITCH LOAD FITTING, BOTH FITTINGS BORE DIAMETER EXCEED PRODUCTION LIMITS.