What was found
LEFT ELEVATOR RIB AT STATION 180 IS CRACKED AT THE TRAILING EDGE. FABRICATED AND INSTALLED REPAIR.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
LEFT ELEVATOR RIB AT STATION 180 IS CRACKED AT THE TRAILING EDGE. FABRICATED AND INSTALLED REPAIR.