What was found
SHEAR TIE AT FUSELAGE STATION 370 BETWEEN LONGERON 30 AND LONGERPM 29 RIGHT IS CORRODED -- REMOVED, FABRICATED AND INSTALLED SHEAR TIE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SHEAR TIE AT FUSELAGE STATION 370 BETWEEN LONGERON 30 AND LONGERPM 29 RIGHT IS CORRODED -- REMOVED, FABRICATED AND INSTALLED SHEAR TIE.