What was found
DURING CLIMB TO 8,000 FEET POWER DECREASED , UN-COMMANDED, FROM 92% TO 70%. TROUBLESHOOTING REVEALED THE ELECTRIC CHANGE OVER VALVE, P/N-E4A-41-300-801 WAS DEFECTIVE. THAT PART WAS REPLACED AND ALL OPERATIONAL CHECKS SHOWED PROPER OPERATION.