What was found
R ENG FIRE LOOP 2. DEFERRED PER 767 MEL 26-11-01-01. PERFORMED FIM 767-26-11 FT 809 TS FIXED AND CLEARED RH FIRE LOOP OPS CHECKED IAW AMM 26-10-01
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
R ENG FIRE LOOP 2. DEFERRED PER 767 MEL 26-11-01-01. PERFORMED FIM 767-26-11 FT 809 TS FIXED AND CLEARED RH FIRE LOOP OPS CHECKED IAW AMM 26-10-01