What was found
CONFIG WARNING ON TAKEOFF ROLL. VERIFIED POWER TO RELAY 8 GA W PINX1. VERIFIED GROUND TO RELAY AT 8GA PIN X2.5. VERIFIED GROUNDS FROM RELAY 8GA PINS D1 AND A2. VERIFIED OPERATION OF L POWER LEVER QUADRANT SWITCH PINS 5 AND 6 AT P1. VERIFIED OPERATION OF R POWER LEVER QUADRANT SWITCH PINS 5 &6 AT P2. VERIFIED OPERATION OF R CONDITION LEVER QUADRANT SWITCH PINS AT 5&6 PE. FOUND L CONDITION LEVER QUADRANT SWITCH STAYS IN OPEN POTIONS WHEN LEVER IS MOVED CHECKED PINS A 5 &6 AT RH P1. REMOVED CONTROL QUADRANT IAW SAB 340 AMM 76-10-05-04 TROUBLESHOOT SYSTEM USING WM 76-10-00. VERIFIED CONTINUITY BETWEEN LT BOARD WOW SWITCH AND RELAY AT 8GA. SWAPPED RELAY AT 8 GA NO FIX . INSTALLED NEW CONTROL QUADRANT IAW