As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
RTB, NR 1 ENG GENERATOR FIELD LT NR 4 ADP INOP. NR 2 GENERATOR ALREADY ON DEFERRAL, 1-2ND RTB NR 3 GEN INOP. SWAPPED NR 1 & NR 2 GCU (NR 2 GEN DEFERRED) OPS NORMAL. CLEANED & RESEATED CONNECTORS FOR NR 4 ADP S/O VALVE, ADP OPS NORMAL 2ND RTB NR 3 ENG GENERATOR OPS CHECKED NORMAL ON ENG RUN. SWAPPED GLU'S FROM NR 2 GENERATOR (ON DEFERRAL) NR 1 GEN OPS NORMAL. NO FURTHER DISCREPENCIES.