What was found
NR 4 HYDRAULIC QUANTITY WENT TO ZERO IN CLIMB. FOUND HYDRAULIC LEAK ON NR 4 ENG EDP. REMOVED EDP AND INSTALLED HYDRAULIC PUMP FROM THE NR 3 ADP POSITION. OPS AND LEAK CHECK OK. NR 3 ADP DEACTIVATED PER MEL 29-2A.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NR 4 HYDRAULIC QUANTITY WENT TO ZERO IN CLIMB. FOUND HYDRAULIC LEAK ON NR 4 ENG EDP. REMOVED EDP AND INSTALLED HYDRAULIC PUMP FROM THE NR 3 ADP POSITION. OPS AND LEAK CHECK OK. NR 3 ADP DEACTIVATED PER MEL 29-2A.