What was found
NR 1 GEN ON APU INOP. "CORRECTIVE ACTION": REPLACED NR 1 GENERATOR. OPS CHECK OK PER MM 24-21-03.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NR 1 GEN ON APU INOP. "CORRECTIVE ACTION": REPLACED NR 1 GENERATOR. OPS CHECK OK PER MM 24-21-03.