Service difficulty report · Potentiometer · Urocop EC135T2

Difficulty date
October 20, 2024
Submitted
October 21, 2024
Operation
Air carrier
Aircraft
N136VA
Make and model
Urocop EC135T2
Aircraft serial
0281
Aircraft time
11,256 hours, 32,056 cycles
Engine
Tmeca ARRIUS2B1
Engine time
8,919 hours, 9,377 cycles
Part
Potentiometer
Condition
Faulted
Stage of operation
NR
How discovered
O
Nature of condition
O
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

TORQUE SPLIT ON TAKE OFF. REDUCED COLLECTIVE, AND TORQUE MATCHED. TORQUE SPLIT AGAIN IN CRUISE FLIGHT. #1 TORQUE WAS 12-15% HIGHER AND FLUCTUATING. TORQUES HELD THAT SPLIT, THEN # 1 WOULD FLUCTUATE. UNABLE TO MATCH TORQUES. DIVERTED BACK TO BASE WITH PATIENT ON BOARD. BASE WAS AS CLOSE OF AN OPTION AS ANYWHERE ELSE. REDUCED #1 TWIST GRIP TO MATCH TORQUES AND PERFORMED RUNNING LANDING. CHANGED OUT N2 POTENTIOMETER DUE TO TORQUE SPLIT IN FLIGHT WITH GUIDANCE FROM AMM 76-11-00, 8-61. PERFORMED N2 CHECKS, GROUND RUNS AND FCF.