What was found
PDX - CORROSION IN BOTTOM U CHANNEL OF RIB 2230, RT COLLECTOR TANK, BETWEEN STRINGER 5 AND 6, FROM FORWARD SPAR. REPAIRED IAW FOKKER SRM 57-01-01, PAGE 5, PARAGRAPH B3A.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PDX - CORROSION IN BOTTOM U CHANNEL OF RIB 2230, RT COLLECTOR TANK, BETWEEN STRINGER 5 AND 6, FROM FORWARD SPAR. REPAIRED IAW FOKKER SRM 57-01-01, PAGE 5, PARAGRAPH B3A.