What was found
MAJOR REPAIR: FOUND CRACKED RIB 12 UPPER FLANGE JUST FWD OF STRINGER 02R. REMOVED, MATCH DRILLED NEW AND INSTALLED RIB 12A IN RT HORIZONTAL STAB IAW SRM 51-41-02, 51-40-02, 51-41-01, AND 51-42-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAJOR REPAIR: FOUND CRACKED RIB 12 UPPER FLANGE JUST FWD OF STRINGER 02R. REMOVED, MATCH DRILLED NEW AND INSTALLED RIB 12A IN RT HORIZONTAL STAB IAW SRM 51-41-02, 51-40-02, 51-41-01, AND 51-42-02.