What was found
DURING O2 DROP, RT SIDE PSU OXYGEN DOORS FAILED TO OPEN. REPAIRED WIRES AT FWD RT OVERHEAD BIN IAW AMM 20-11-00 PGS 14 & 15. STEP OPERATIONAL TESTED OK IAW AMM 35-20-00.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING O2 DROP, RT SIDE PSU OXYGEN DOORS FAILED TO OPEN. REPAIRED WIRES AT FWD RT OVERHEAD BIN IAW AMM 20-11-00 PGS 14 & 15. STEP OPERATIONAL TESTED OK IAW AMM 35-20-00.