What was found
TOP OF FLOOR BEAM IS CORRODED AT LBL9 BETWEEN FS 661+16 AND FS 664+32. IREMOVED AND REPLACED CORRODED LBL 9.0 FLOOR BEAM SEGMENT P/N SH690-33413-11 FROM PRODUCTION SPLICE AT FS661.00+22.50 TO PRODUCTION SPLICE AT FS685.50 PER CRJ 900 SRM 53-00-41-201-001-A03, FIG. 53-00-41-995-829, MHIRJ SNIEO SH690-33413-S02, MHIRJ SNIEO SH690-33400, MHIRJ REO 690-53-31-658,