What was found
"LBL9 FLOOR SUPPORT IS CORRODED BETWEEN F.S. 1031 TO F.S. 1069.75 AND ADDITIONAL CORROSION ON OB FLANGE AT LBL9 FS1031. REMOVED CORROSION ON OUTBOARD FLANGE LBL9 FS1031 IAW CRJ 700 SRM 51-21-06-001-001-A01. INSTALLED NEW SERVICEABLE FLOOR SUPPORT FS1025 TO FS1082 WITH EXTRUSION P/N S6283 PO: 5-47274, INSTALLED 02 NEW SERVICEABLE SPLICES P/N N126-1731 PO: 5-48464 AND 02 NEW SERVICEABLE SHIMS P/N 2024T3 .040"" PO:5-23072 AT FLOOR BEAM FS1082, INSTALLED FS1082 REPAIR LOWER SPLICE P/N 7075T6 .125"" PO: W89369, INSTALLED CROSSBEAM LOWER SPLICE AT FS 1069.75 P/N 7075T6 .090"" PO: 5-45128 IAW CRJ-700 SRM 53-00-41-201-001-A01 STEPS 5B(10-11), AND 51-41-02-001-001-A01."