What was found
CENTER BOX LEFT AFT LOWER HOR. STAB HAS BUSHING CRACKED. UNABLE TO CONFIRM WHETHE IF BUSHING IS SHRINKFIT OR FORCEMENT & P/N IS UNAVALIABKE, PER EAR #5 RESPONSE STEP 1. PERFORMED A DVI, IAW SRM 51-10-04-0G-0 REV 23, GOUGE & CRAVK NOTED AT DEFECT AREA. PER EAR #5 RESPOSE STEP 2. REMOVED 4EA AFFECTED BUSHING ONTO LHS HOR. STAB CENTER SEC SPAR LOWER CLEVIS FWD LUG AND AFT LUG IAW EA #737-5510-72-B0423 REV. P1 STEP 2 AND BOEING 5B 737-55-1074 FIG. 15 PART A STEP 1. PERFORMED CLEANING ON LOWER CLEVIS FWD LUG AND AAFT LUG AT LHSS HOR. STAB CENTER SEC. REAR SPAR IAW EA# 737-5510-72-B0423 REV. P1 STEP 2 AND BOEING SB 737-55-1074 FIG. 15 PART A STEP 2.