As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING A HEAVY MAINTENANCE CHECK, THE SHEAR TIE IN THE FORWARD PIT AT STATION 635 LGR 43R WAS FOUND CRACKED. REMOVED SHEAR TIE IAW DC10 SRM 513501 VOL 2. DYE PENETRATED SHEAR TIE AND NO CRACKS FOUND. ALODINED AND PRIMED IAW 512101 VOL 2. REINSTALLED SHEAR TIE IAW DC10 SRM 513501 VOL 2.