Service difficulty report · Wire · Emb EMB145LR

Difficulty date
August 2, 2013
Submitted
August 5, 2013
Operation
Air carrier
Aircraft
N933JN
Make and model
Emb EMB145LR
Aircraft serial
14500918
Aircraft time
21,884 hours, 18,074 cycles
Part
Wire
Condition
Broken
Location
Thermoswitch
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING CRUISE, FL 280, EXPERIENCED A SYS 2 BLEED LEAKING WARNING. APPLIED AOM VOL 1 PROCEDURES AND WERE UNABLE TO RESOLVE ANOMALY. DIVERTED. A CHECKLIST DRIVEN "PRECAUTIONARY" ENGINE SHUTDOWN WAS APPLIED AND AN EMERGENCY WAS DECLARED. LANDED WITHOUT INCIDENT. ACFT REMOVED FROM SERVICE. DURING TROUBLESHOOTING, FOUND RT AFT OVERWING COUPLING O-RING BLOWN, REMOVED AND REPLACED BOTH O-RINGS IAW AMM 36-11-10. PERFORMED LEAK TEST AND OPS CHECKED GOOD. NO EICAS MESSAGES PRESENT AT THIS TIME. FOUND THERMAL SWITCH IN RT PYLON HAD TWO BROKEN WIRES. R & R THERMAL SWITCH IN RT PYLON IAW AMM 36-20-02, PERFORMED TEST OF SWITCH IAW AMM 36-20-02, TASK 36-20-02-700-801-A. TEST CHECKED GOOD. ACFT RETURNED TO SERVICE.

More about the Emb EMB-145LR