Service difficulty report · Wire Harness · Emb EMB145LR

Difficulty date
January 14, 2015
Submitted
January 15, 2015
Operation
Air carrier
Aircraft
N633AE
Make and model
Emb EMB145LR
Aircraft serial
145148
Aircraft time
37,121 hours, 33,936 cycles
Part
Wire Harness
Condition
Faulty
Location
Nlg
Stage of operation
CL
How discovered
O
Nature of condition
J
Precautionary procedure
B

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AFTER TAKEOFF, AFTER GEAR RETRACTION, LG AIR & GND FAIL, ENG 1 2 REV FAIL AFTER GEAR EXTENSION, ALL MSG EXTINGUISHED BUT ENG POWER DID NOT GO TO TAKEOFF. 1 THRUST SETTING WITH GEAR EXTENSION BLOW 15,000 FT AFTER GEAR EXTENSION, ALL GEAR SYS FUNCTIONED NORMALLY. INSPECTED WIRING & NLG PROXIMITY SWITCH, NO DEFECTS NOTED. COMPLIED WITH ETN EM-32-245. SERVICED NLG STRUT WITH NITROGEN IAW AMM 32-20-01. COMPLIED WITH ELEC CONTROL SYS ADJUSTMENT & TESTED IAW AMM 76-12-00. ALL CHECKS WERE NORMAL. ACFT OK FOR FCF PURPOSES ONLY. SEE ITEM 2 THIS LOG PAGE IAW NRWC 633-ORD-02079. R & R NLG HARNESS W019 & NOSE WOW PROXIMITY SWITCH IAW MM 32-00-03 & MM 32-63-02. ACFT RELEASED FOR FCF PURPOSES ONLY. REF ITEM 4 THIS LOG PAGE FOR FCF INFO.

More about the Emb EMB-145LR