What was found
BLD 1 LEAK DURING CLIMBOUT, EPC C/W. -C/A-PERFORMED REMOVED AND REPLACED OF DUAL TEMP CONTROL VALVE Y-DUCT IAW AMM 21-60-01. LEAK CHECK GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
BLD 1 LEAK DURING CLIMBOUT, EPC C/W. -C/A-PERFORMED REMOVED AND REPLACED OF DUAL TEMP CONTROL VALVE Y-DUCT IAW AMM 21-60-01. LEAK CHECK GOOD.