What was found
REPEAT ISSUE - STRONG SMELL ON TAKE OFF TO 2500' IN FLIGHT DECK AND FWD CABIN. ENGINE RUNNING, APU OFF, T/O POWER APPLIED.-C/A-PERFORMED FIM TASK 72-00-00-01-003 SUBTASK 72-00-00-810-021 STEPS UP TO AND INCLUDING FIGURE 131 (SHEET 1) STEP 3 OF FLOW CHART "DO AN ENGINE RUN, IDLE FOR 3 MINUTES, 70% N1 FOR 10 MINUTES" EXCLUDING "DO A PRV PROCEDURE. REFER TO TASK 75-00-00-800-808 ( 75-00-00, SPECIAL PROCEDURES 008- SEAL PRESSURE REGULATOR VALVE- REMOVAL, INSPECTION AND INSTALLATION)."