What was found
FLOOR BEAM GOUGED AT FWD WET AREA FR12- FR13, Y=+37". (MAJOR REPAIR). BLENDED GOUGED AREA PER EMB 175 SRM 51-10-03. AREA FOUND TO BE IN NO DAMAGE ALLOWABLE AREA PER EMB SRM 53-00-10/AD01. REMOVED BEAM AT FR12-13 Y= +37 PER EMB 175 SRM 51-40-08. LOCATED AND DRILLED NEW FLOOR BEAM PN: 170-07301-003 PER EMB 175 SRM 51-40-02. INSTALLED FLOOR BEAM AT FR12-FR13 Y= +37 PER EMB 175 SRM 51-43-02. RESTORED FINISH ON RH FWD FLOOR BEAM BETWEEN FR12-FR13 Y= +37, USING ALODINE, PRIMER, TOPCOAT, AND CORROSION INHIBITING COMPOUND PER EMB 175 SRM 51-23-04, EMB 175 SRM 51-23-05, EMB 175 SRM 51-23-06, EMB 175 CPM 51-27-00-910-001A-CIC, ETN-EJ-51-008, ETN-EJ-51-015 AND ETN-EJ-51-025. REMOVED AND REPLACED FLOOR BEAM (PN: 170-07301-003) AT FWD WET AREA FR 12-FR13 Y=+37" PER EMB 175 SRM 51-40-08.