What was found
DURING SCHEDULED D CHECK, FOUND CORROSION ON FLOORBEAMS UPPER SURFACE AT BS 312, LBL 10, AND UPPER AND LOWER SURFACE AT BS 328, RBL 9 - RBL 58. REPAIRED CORRODED SECTION OF FLOORBEAMS PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND CORROSION ON FLOORBEAMS UPPER SURFACE AT BS 312, LBL 10, AND UPPER AND LOWER SURFACE AT BS 328, RBL 9 - RBL 58. REPAIRED CORRODED SECTION OF FLOORBEAMS PER SRM.